|

Amritsar Swadeshi
Textile Corp. Pvt. Ltd., Garment division has two
factories totally covering an area of more than
50000 Sq.ft. with all the in-house
infrastructure for making garments of high
quality standards. Following are our
infrastructure details.
Pattern Making and Sampling
There are two experienced pattern makers who
can make patterns of the basic to highly
constructed garments for all genders / age group
and for the production patterns use LECTRA Cad
system. Further we have a team of experienced 20
tailors to make all kinds of garment samples.
Our per month capacity in this section is more
than 50 new patterns and 2000 sample garments.
Cutting
Department
We have 4 Lay tables, 3 cutting machines, 1
Band knife and 1 Fusing machine with a team of
30 people headed by experienced Cutting Manager
who can cut 2000 pcs per day.
Sewing Line
We have 8 batches having 350 machines which
included all requisite special machine viz.
Automatic loop making / attaching, Patch pocket
creasing and setting, Welt pocket machine,
design stitch AMS machine, Automatic waist band
unit, Automatic feed of arm machine and
Automatic hemming machine. Also included are
latest models of double needle lock stitch
machine and Automatic bartack machine.
A team of 450 workers
is led by Production Manager, Assistant
Production Manager, 2 Floor In chargers, and efficient
batch supervisors.
Depending on style, an average production of
1600-2000 pcs are stitched per day.
Washing Unit
Our washing units consists of 1 boiler for
steam, 2 washing machines, 1 Hydro Extractor, 2
Dryers and an ETP unit [approved by Pollution
Control Board] to take care of effluent
discharge. An expert Washing Manager with a team
of 5 members can do almost 60 types of washes
viz. Stone, Enzyme, Softener, etc. We also do
Pigment / Reactive colors garment Over Dyeing in
our washing unit. The capacity is about
1000-2000 garments per day depending on the kind
of wash / over dyeing.
Finishing
Department
We have provided the maximum available space
[8000 sq.ft.area] for this department. All the
requisite machine like Button hole, Eyelet, Snap
attaching and Thread sucking machines are with us. We
have 1 stand by boiler for steam, 12 iron
tables, 3 folding tables, 2 trouser toppers and
1 multi form for pressing / finishing. A
team of 80 members led by 2 experienced
Finishing Managers are able to finish 2000
garments per day.
Q.A. Department
We follow JC penny system of Q.A. management
within the company. Our Q.A. manager with his
team of 12 peoples heads this department independent
of the production department. Each aspect of the
production process is independently checked by
the Q.A. team. We also provide Q.A. reports of
the final audit of garments to our customers on
request.
|